Cooldown Commons
UrbanismClient
Cairn
Architect
Reddy Architecture
Project Manager
Cairn
Main Contractor
Cairn
Quantity Surveyor
Cairn
Project Size
300 Units
Project Status
Completed
Project Description
300 unit residential development over 5 blocks including amenity space and public realm. Central heating plant using high-efficiency gas boilers with CHP and Mechanical Heat Recovery Ventilation systems formed the mechanical energy strategy.
Ethos Input
Ethos provided Mechanical and Electrical Engineering advice and energy advice. The strategy to achieve Part L compliance was developed in parallel with the changes to statutory analysis software which required close liaison with SEAI.
Unique / Key Features
•Central Plant
• Amenity Spaces
• Public Realm