Confidential Data Centre
Data CentreClient
Confidential
Architect
RKD Architects
Quantity Surveyor
Linesight
Project Manager
Linesight
Main Contractor
TBC
Civil Structural Engineers
Hanley Pepper
Project Size
19.2MW
Project Status
Achau: 23/06/2023 - IFP, 10/09/2025 - Construction, Vienna: Complete
Project Description
The data centres comprise of 2 units of 9.6MW COLO’s and associated electrical support rooms, including electrical rooms, battery rooms, prefabricated MV rooms, and an expansion of the existing 160MVA 110kV substation.
Ethos Input
As the mechanical and electrical deliverables provider, Ethos Engineering utilised BIM and Revit MEP to design the MEP services. The M&E services were developed to LOD 300 and transferred to the main contractor to complete throughout the project. Ethos Engineering provided full MEP design services and construction administration support.
Unique / Key Features
The cooling system utilises air side economisers (outside air) to cool the server and electrical spaces, achieving an all-air cooling system. Some areas (Battery Rooms) have additional DX Cooling provided. As this site was initially limited by available power in the region, the design team needed to design for ‘temporary’ infrastructure that would need to be replaced and upgraded as power became available from the utility.