Confidential Data Centre

Data Centre

Client

Confidential

Architect

RKD Architects

Quantity Surveyor

Linesight

Project Manager

Linesight

Main Contractor

Jones Group

Civil Structural Engineers

COWI

Project Size

48MW for Gavle, 28.8MW for Malmö

Project Status

Complete

Project Description

The Malmö data centre consists of 1 unit of 9.6MW COLO and the Gavle data centre consists of 5 units of 9.6MW COLO’s. Both have associated electrical support rooms (electrical rooms, battery rooms, prefabricated MV rooms, etc.) and infrastructural works including the construction of 110kV substations for each.

Ethos Input

As part of the mechanical and electrical deliverables for both of these projects, Ethos Engineering was commissioned to provide the design through BIM and Revit MEP was used for this project. The M&E services were developed to LOD 300 and transferred over to the main contractor to complete throughout the project. Ethos Engineering provided full MEP design services and Construction Administration support.

Unique / Key Features

For both projects, the cooling was achieved by an all-air cooling system, utilising air side economisers (outside air) to cool the server and electrical spaces. Some areas (battery rooms) had additional DX cooling provided. The projects also involved infrastructure pre-positioning for a future no generator design. Pre-positioning included above and below ground infrastructure, space planning for future MV Switchgear & MV / LV transformers, etc.

Slider Image
Call to action background graphic
Call to action image

Want to know more about this project?

We’re excited to make a difference in your community! What can we tell you more about?

Get in touch

Related Projects

Sorry, there are no related projects for this category.