Confidential Data Centre

Data Centre

Client

Confidential

Architect

RKD Architects

Quantity Surveyor

Bruce Shaw

Project Manager

Bruce Shaw

Main Contractor

Sisk

Civil Structural Engineers

Hanley Pepper

Project Size

71MW

Project Status

Completed June 2015

Project Description

The project was situated on a greenfield site, within the Grangecastle campus and contained an administration block and RMC (Remote Monitoring Centre). The RMC was to be utilised initially, as a control monitoring HUB for other data centres located in the EMEA region.

The site was developed and expanded as required on a phased basis with the first phase consisting of 4 No. 4.4MW COLO’s and associated electrical support rooms (Electrical Rooms, MDF Rooms, MV Rooms etc).

Ethos Input

Upon successful design completion of works to previous client projects (Phase 4 Commissioning and Phase 5 Design Consultancy), Ethos Engineering were retained and appointed as Mechanical and Electrical Design Consultants for Phase 6.

The role also included the master-planning of the site for future development with a projected critical load of 120MW. The primary infrastructure including the 110kV substation has been completed for the site.

Unique / Key Features

The cooling was achieved by an all air cooling system, utilising air side economisers (outside air) to cool the server and electrical spaces. Some areas (MDF Rooms) had additional DX Cooling provided.

Slider Image
Share this Project
Call to action background graphic
Call to action image

Want to know more about this project?

We’re excited to make a difference in your community! What can we tell you more about?

Get in touch

Related Projects

Sorry, there are no related projects for this category.