Ryanair Office

Urbanism

Client

Ryanair

Architect

Henry J Lyons

Project Status

Complete

Project Description

This project involved the fit-out of an existing office building in Airside Block 2 for Ryanair. Originally constructed in 2008 as a shell and core by the developer at the time, the fit-out design comprised both developer and tenant elements. The areas designated as “developer” zones were occupied by Ryanair, while the “tenant” areas were intended for future lease by potential occupiers.

Ethos Input

Ethos Engineering was commissioned to provide full Mechanical and Electrical (M&E) design services for the project, acting as the client’s M&E services consultant throughout all project stages.

Unique / Key Features

The completed building consisted of five floors of office space in the north block and four floors in the south block. An undercroft car park located on the ground floor of the south block was developed into additional office accommodation. Ryanair occupied the north block from the ground to the third floor, along with the repurposed undercroft space. The remaining areas were designated for tenant occupation.

Slider Image
Call to action background graphic
Call to action image

Want to know more about this project?

We’re excited to make a difference in your community! What can we tell you more about?

Get in touch